|
Summary
A broad grassed floodway through 40 private properties
was built to contain 100 year flood flows in order to prevent over-floor
flooding of the homes. The project has only been possible because
the property owners have allowed the floodway to be built through
their land without any compensation or purchase. A new bridge at
Barangaroo Road was built to replace an under capacity culvert and
bank protection works immediately downstream also occured.
|