Home Page About the Trust Home Page Flood Mitigation Home Page Sustainable Water Home Page Water Quality Home Page Vegetation Home Page

PROJECTS:

Flood Mitigation Database and Priority Setting Procedure: Entire Catchment

Summary

This study collected and systematically recorded details of all known flooding and trunk drainage problems in the catchment and possible solutions; soon after the Trust was established. An objective and regularly updated procedure for ranking outstanding problems and solutions was also developed at that time. This procedure has been used by the Trust ever since to select works and studies to be included in the Trust's annual works program and budget.







Trust logo