PROJECTS:
Summary
An inadequately sized culvert over Toongabbie Creek was replaced with a bridge able to pass major flood flows, thereby preventing flooding of 11 nearby factories.
© 2001 Upper Parramatta River Catchment Trust PO Box 3720 PARRAMATTA NSW AUSTRALIA 2124 Telephone +61 2 9891 4633 Fax +61 2 9689 2537 Email uprct@uprct.nsw.gov.au
Web design by Wild Red Frog Design