Summary

This project involved the construction of a flood basin in Gooden Reserve to detain stormwater runoff from the adjoining M2 Motorway as well as the local catchment. It protects 10 homes and 28 properties downstream from flooding. The RTA and the builders of the M2 met two-thirds of the cost of this project. An innovative fuse plug spillway, extensive landscaping and cost sharing were significant features of this project.