Summary
This project involved the construction of a flood
basin in Gooden Reserve to detain stormwater runoff from the adjoining
M2 Motorway as well as the local catchment. It protects 10 homes
and 28 properties downstream from flooding. The RTA and the builders
of the M2 met two-thirds of the cost of this project. An innovative
fuse plug spillway, extensive landscaping and cost sharing were
significant features of this project.
|