Summary
This section of creek was reconstructed in 2000/2001.
The creek was overgrown with willows, poor soil and poor channel
alignment and the stormwater lines discharged straight into the
creek. These factors have caused massive bank erosion . This project
reconstructed the creek creating a stable channel able to contain
at least the 20-year peak flow.

|