Home Page About the Trust Home Page Flood Mitigation Home Page Sustainable Water Home Page Water Quality Home Page Vegetation Home Page

PROJECTS:

Greystanes Creek Reconstruction: Toongabbie Bowling Club, Toongabbie

Summary

This section of creek was reconstructed in 2000/2001. The creek was overgrown with willows, poor soil and poor channel alignment and the stormwater lines discharged straight into the creek. These factors have caused massive bank erosion . This project reconstructed the creek creating a stable channel able to contain at least the 20-year peak flow.







Trust logo