Home Page About the Trust Home Page Flood Mitigation Home Page Sustainable Water Home Page Water Quality Home Page Vegetation Home Page

PROJECTS:

Sydney Smith Park Flood Retarding Basin: Domain Creek Mays Hill

Summary

A multi faceted flood-retarding basin was built by Holroyd City Council in 1999 in a park in the piped reaches of the Domain Creek drainage line to protect 24 flood liable homes downstream and improve water quality in the creek. Although it is not obvious to a casual passer-by, the innovative basin also has an infiltration medium and several litter and pollution traps to improve water quality and an underground storage tank to retain stormwater for reuse in the reserve.

The project was made possible with a grant of $360,000 from the NSW Stormwater Trust, a contribution of $305,000 from this Trust and $400,000 from Holroyd City Council.







Trust logo