|
Title
|
Date
|
Electronic version and File size
|
|
Explanation of flooding and why it occurs in the Catchment
as well as what you can do to help
|
2005 |
200 KB |
|
Common questions about flooding and their answers
|
2005 |
374 KB |
| Onsite Stormwater Detention |
|
|
- On-site Stormwater
Detention (OSD) Handbook, 4th Edition
The Trust’s OSD policy was developed in conjunction with
the four councils and was adopted by each of the councils
in November 1991. This Handbook spells out the OSD policy
and provides guidance for OSD designers, property owners
and others involved with development. Although primarily
concerned with the Upper Parramatta River Catchment, the
Handbook also shows how the procedure on which the policy
is based can be adapted to provide approximate parameters
in other locations.
|
2005
|
pdf (8000 KB)
document can be downloaded in smaller sections
on the OSD page
|
- What is On-site
Stormwater Detention
The Trust has published a brochure to answer questions such
as what does an OSD facilty look like? Why do we need OSD?
Why does urban development cause flooding? Is OSD compulsory?
Other solutions for flood mitigation. Either download the
brochure from the website or Email the Trust on uprct@uprct.nsw.gov.au
or call 9891 4633 for a free brochure.
|
2003
|
pdf (763 KB)
|
|
|
2001
|
Word
|
|
|
October 2003 |
22 files
pdf (72KB to 14828 KB)
|
|
Assessment of the impact of planning controls and public
notifications regarding flood risks, upon property values
|
July 2000 |
pdf (3264 KB) |
|
by the Upper Parramatta River Catchment Trust
|
December 1992 |
pdf (2436 KB) |
|
|
1999
|
9 pdf files (515 KB to 1.25MB)
|